Woolworths Lancaster Gate
SJ Electric Victoria completes Woolworths Lancaster Gate project in November 2012
 
 
 
 
Hyatt Regency, Perth, Fire Detection
SEME Solutions was awarded a contract in May 2012 to replace the Fire Detection system at the prestigious Hyatt Regency Hotel in Perth WA
 
 
 
 
Rialto Tower Nabers Energy Metering
Ladd Electric brings the Rialto Tower in line with curent energy monitoring standards.
 
 
 
 
Lower Murray Water, Lake Cullulleraine Water Improvements
CEI contracted by Lower Murray Water to provide a turnkey solution
 
 
 
 
Solar Power CCTV Monitoring Trailer
Solar Power CCTV Monitoring trailer contract awarded to Group CCTV
 
 
 
 
Eldercare Head Office Refurbishment
SJ Electric SA to install electrical services to Eldercare Head Office
 
 
 
 
Kmart & Coles Traralgon Fire
On Sunday 24th April 2010 at 8.00pm SJ Electric were called out to Kmart Traralgon to assist with electrical services as fire took hold in the store.
 
 
 
 
 
Case Studies
Invalid document asset
Subscribe
To receive regular Trivantage news updates enter your email address in the box below and click on the sign-up button.
 
 
 
 
Latest News
News Article
Woolworths Lancaster Gate
SJ Electric Victoria completes Woolworths Lancaster Gate project in November 2012
News Article
Hyatt Regency, Perth, Fire Detection
SEME Solutions was awarded a contract in May 2012 to replace the Fire Detection system at the prestigious Hyatt Regency Hotel in Perth WA
News Article
Rialto Tower Nabers Energy Metering
Ladd Electric brings the Rialto Tower in line with curent energy monitoring standards.
News Article
Lower Murray Water, Lake Cullulleraine Water Improvements
CEI contracted by Lower Murray Water to provide a turnkey solution
News Article
Solar Power CCTV Monitoring Trailer
Solar Power CCTV Monitoring trailer contract awarded to Group CCTV
News Article
Eldercare Head Office Refurbishment
SJ Electric SA to install electrical services to Eldercare Head Office